Solution designbefore hardware is chosen.

Solution Design

Plan the systemaround the workit needs to support.

IntelliTrac helps map the operating goal, vehicle mix, field workflow, hardware options and reporting needs before a rollout starts.

Map the operation

Start with the vehicles, assets, teams, rules and reports that shape the daily work.

Choose the right stack

Match platform workflows, hardware, accessories and support paths to the job each team needs done.

Plan for change

Leave room for staged rollout, integrations, training and future expansion without overbuilding the first step.

Before anything is bought

Great rollouts are designed, not ordered. We map your operation first, so the hardware and the IntelliTrac platform fit the work instead of the other way around.

Design Workflow

Turn unclear needsinto a practical rollout plan.

A useful design process keeps the business problem in front of the hardware decision, so the setup supports real work after launch.

Start with the outcome, not the device list.
Fleet, safety, compliance and field needs first.

The design conversation identifies what must improve, who needs the information and where the current process breaks down.

  • Confirm the fleet and asset groups involved
  • Name the reports and decisions the system must support
  • Separate urgent needs from future expansion

Shape the stack around real constraints.
Coverage, power, installation and user workflows.

Hardware and platform choices are checked against how each vehicle, asset and team actually works in the field.

  • Match plug-in, installed, camera and access hardware to the job
  • Plan mobile, desktop and reporting users together
  • Identify integration or export needs before rollout

Leave the team with a clear next step.
First stage, rollout path and support responsibilities.

The plan should make the first deployment stage understandable for operations, finance, IT and the people who will use it each day.

  • Define the first rollout stage
  • Identify training and support paths
  • Keep upgrade options visible without forcing them upfront
The Rollout Journey

Four stepsto live.

Every rollout runs the same proven path, with the same team carrying you from the first conversation to long after go-live.

  1. 01

    Design the right setupYou are here

    We map your fleet, your sites and your workflows, then design the IntelliTrac platform and hardware mix around them.

  2. 02

    Install and roll out

    Devices fitted, access set up and data flowing, coordinated around your vehicles' availability.

    Explore installation
  3. 03

    Connect and report

    The IntelliTrac platform talks to your finance, GIS and business systems, and the reports land where people work.

    Explore integrations
  4. 04

    Train and support

    Every role learns their daily workflow, with a direct support path that doesn't go cold after launch.

    Explore training and support
Solution Planning

Cover the choicesthat affect adoption.

Good solution design makes later decisions easier: installation, user training, reporting, support and future integrations all have a place in the plan.

Video systems

Add cameras where safety reviews, claims or customer disputes need footage.

Asset tracking

Extend visibility to trailers, tools, equipment and portable assets.

All your operationaldata. As one.

Connect telematics, video safety, compliance,
shared fleet access, assets, and field workflows.

Talk to IntelliTracTalk to IntelliTracTalk to IntelliTracExplore SolutionsExplore SolutionsExplore Solutions

IntelliTrac provides fleet, telematics and field-operations software in Australia. Call 1300 767 492.