GiveGive eacheach visitvisit aa practicalpractical plan.plan.
Match jobs to available people and vehicles, review route proposals and follow updates from the field. Keep the dispatcher in control when the day changes.
The crew app shares location updates and job progress as staff travel, arrive and complete the visit. Staff add notes, photos and checklists, with customer sign-off on customer jobs.
FromFrom aa repairrepair toto aa plannedplanned sitesite visit.visit.
An approved maintenance request becomes a work order. Schedule its field visit, plan the route and send the job to the crew. Their updates return to the office for maintenance follow-up.
A repair can need a workshop, an external repairer or a crew at the asset’s location. Keep that decision with the work order, then schedule the visits it needs.
Pre-start checkMaintenance request PLT-204Needs approvalBrake warning lightBrakesBefore next trip MR-3382 · Ava M.
Keep repairers and follow-up in view
Manage an outsourced repair with the vendor’s messages and charges against the work order. Schedule an internal follow-up visit when your team needs to inspect or finish the repair.
Bring scheduled field visits into route planning. Optimise the stop order around appointment windows, crew availability and vehicle requirements, then publish the run for the crew.
PlanPlan forfor thethe truck.truck. AdjustAdjust toto thethe road.road.
Vehicle routing profile
Height
3.8 m
Mass
18 t
Axles
2
Restriction found
Low bridge · 3.5 m clearance
Alternative road selected
Route around vehicle restrictions
Use the height, width, length, mass and axle details in your asset profile to plan around road restrictions. NHVR network information helps assess heavy-vehicle access where coverage is available.
Remaining route revised around the closure under the configured recovery policy.
Keep the next stop within reach
Use available live traffic and road-incident data to account for delays and closures. Replan the remaining stops around crew availability and appointment times; flag visits that still need the dispatcher’s attention.
Vehicle dimensions, mass and configuration are checked against available road and heavy-vehicle network information. This helps identify restrictions before dispatch. The operator still needs to confirm applicable access conditions and any required permits.
The crew app sends location and job-status updates, including arrival, delays and completion. Staff can submit notes, photos and checklists, and collect customer sign-off on customer-linked jobs. The office can see when the latest update was received.
Use the dispatch queue to review jobs before assigning them. Inspect the location and requirements alongside available resources. The dispatcher remains responsible for the final assignment.
Yes. Field visits can link to maintenance work orders, with appointment times and required resources carried into planning. Completing a field job updates the visit; the maintenance team still reviews and closes the work order separately.
Read the time of the latest vehicle update before relying on its position. A stale update can change which resource is a sensible choice. Confirm with the crew when the map does not provide enough context.
Available live incident information can trigger a review of the remaining route. The system checks alternatives around the closure and the jobs still to attend. Where a replacement cannot meet the requirements, dispatchers can see which stops need attention.